This Project, located some 55 km from the city of Esfahan on the Zayandeh-Rud River was constructed for the supply of potable water to the city. It consisted of a 13m high weir dam, a water intake and a siltation pond.

Clear water enters the 8 km long raw water transmission tunnel(also built by Tablieh as a separate project) from the endpoint of the siltation pond, which will then be treated before finally reaching the city reservoirs by pipeline.

LocationEsfahan Province
ClientEsfahan Regional Water Board
ConsultantParsconsult Consulting Engineers